Drilled conduit paths for fiber routes — long pulls, road crossings, and a clean pathway ready for cable.
02
Gas Line Crossings
Bored crossings and carrier-pipe paths for gas mains and services, locate-verified around live utilities.
03
Electric Duct Runs
Conduit and duct corridors drilled beneath roads, parking lots, and finished surfaces for power.
04
Water & Sewer Bores
Cased bores for water and sewer lines where opening up the surface isn’t an option.
Engineered before we ever arrive.
Road crossings, existing utilities, and surface constraints are all mapped before any equipment shows up — so the drill follows a plan, not a guess.
STA 00+00Entry pit
STA 04+50Locate verified
STA 09+00Road crossing — 6 ft cover
STA 14+20Utility clearance
STA 18+00Exit / pullback
Below grade, by design.
Here's how your project happens: we find everything already buried, steer beneath it, and pull your new line into place — while the street above stays open for business.
Machines that don't stall.
01Route Production
Vermeer D24x40 S3
Compact drilling power for urban and rural routes where thrust, pullback, and site footprint all matter.
Model
D24x40 S3
Thrust / Pullback
24,000 lb
Role
Pilot bore + pullback
02Long Crossings
Vermeer D40x55 Navigator
Step-up thrust and torque for longer runs, larger-diameter product, and harder ground.
Model
D40x55
Thrust / Pullback
40,000 lb
Role
Long bores + larger product
03Fluid Control
Vermeer MX300 Mixing System
Consistent drilling-fluid support for cleaner boreholes, better production rhythm, and fewer field stalls.
Model
MX300
Function
Drilling fluid mixing
Role
Bore stability
04Locate + Cleanup
Vermeer VX50 Vacuum Excavator
Vacuum excavation support for potholing, spoil handling, restoration, and controlled site turnover.
Model
VX50
Function
Soft excavation
Role
Potholing + restoration
05Hydro Excavation
VX1150 Hydro Excavation Truck
Truck-mounted hydro excavation for fast daylighting, deep potholes, and spoil hauled off in the same pass.
Unit
VX1150
Function
Hydro excavation
Role
Daylighting + spoil removal
06Site Logistics
Vertex Support Truck
Stocked service body, crew cab, and a conduit reel trailer — tooling, parts, and product arrive with the crew in one move.
Setup
Crew cab + service body
Tow
Conduit reel trailer
Role
Crew + material logistics
We show up organized.
The site is planned before the first truck arrives — equipment staged, access maintained, and the work zone clearly marked.
01
Utilities verified first
Every existing utility is located and verified before we drill near it — vacuum-potholed where the crossing is tight.
02
Traffic kept moving
Work zones are planned before we mobilize, so lanes, driveways, and walkways stay usable while we work.
03
A weekly report
Photos and a plain-language status each week — what got done, what comes next, and anything that needs your attention.
04
Restored and cleared
Spoil hauled, surfaces restored, and the site cleared promptly after the work is complete.
You'll never wonder what happened on your project.
01Before we drillEvery existing utility on your route is located, marked, and verified — and the bore plan is walked against what’s actually in the ground, not just what’s on the map.You get: Locate tickets + bore plan
02While we workYour site is photographed before, during, and after. Depth and steering readings are logged shot by shot, so the path we drilled is the path we planned.You get: Pilot bore log + photo set
03Every weekA plain-language update: what got done, what happens next, and anything that needs your eyes — sent before you have to ask.You get: Weekly field report
04If something comes upObstructions, conflicts, weather — flagged the moment they appear, with options. Nothing gets discovered at invoice time.You get: Same-day flag + options
05When we finishYou receive the complete project file: as-built depths and alignment, the full photo record, and restoration sign-off — ready for inspectors, owners, and billing.You get: As-built closeout package
The safest dig is the one that never happens.
01
No open trench
Crews, traffic, and neighbors never share the street with an excavation. The work happens below grade, through two small pits.
02
Everything located first
811 locates verified and critical crossings potholed by vacuum — before the drill ever turns. That discipline is the whole job.
03
A fraction of the footprint
Lawns, pavement, tree roots, and waterways stay intact above the bore. Restoration is measured in hours, not weeks.
04
Fluids stay contained
Drilling fluid is managed, recycled, and vacuumed on site. When we leave, the only thing left behind is the line underground.
Tell us about your project.
Share the location, the utility, and your timeline. We'll come back with a clear plan and an honest quote — usually within one business day.